Clik here to view.

There are places in the world that make us feel small and force us to marvel at the skills and ambitions of their architects and engineers. They include cathedrals in Europe, NASA’s Cape Canaveral rocket launch pad or the Panama Canal. GE’s gas turbine plant in Greenville, S.C., may not be on everyone’s list. But it comes close.
The plant’s several manufacturing halls – equivalent in size to nearly 21 football fields – strike most first-time visitors as the playroom of a giant toddler. Massive yellow gantry cranes lift multi-ton rotors and stators gleaming like alien silver sunflowers. They flip them around their axis, and stack them on shafts the diameter and length of tree trunks.
Clik here to view.

This image shows a series compressor rotors on the left and three turbine rotors on the right.
The place smells of high-grade steel and pulses with an industrial symphony of electrical motors cutting in and out. Computer-guided milling machines larger than delivery trucks use jagged cutting heads drenched in white cooling liquid to shape huge turbine wheels.
The plant, which opened in 1968, even has its own railroad spur and also America’s largest train turntable to move the finished turbines around.
There’s also a natural gas plant that supplies a unique test stand designed to push turbines to the limit and withstand hot wind jetting out of them at 1,100 mph – 10 times faster than a Category 3 hurricane.
The place also has a 70,000-square-foot lab replete with 3D printers and powerful lasers. Engineers use them to develop and test parts for next-generation machines like the air-cooled Harriet 9HA turbine – the world’s largest and most efficient gas turbine. Although the facility is strictly off limits to outsiders, GE Reports recently got a tour. Take a look.
Clik here to view.

A gas turbine on the half-shell with three turbine rotors near the front and compressor rotors in the back.
Clik here to view.

Two gas turbine shafts suspended in the air with stacked compressor and turbine rotors.
Clik here to view.

Building gas turbines involves a touch of rocket science and even their production resembles a space factory. Here three GE gas turbines as getting ready for shipping.
Clik here to view.

Finished gas turbines are getting ready for shipping.
Clik here to view.

A gas turbine of the half-shell. This image shows silver compressor blades in the front and turbines blades in the back.
Clik here to view.

The compressor section and inlet casing.
Clik here to view.

A worker is inspecting the top shell of a gas turbine.
Clik here to view.

A series of compressor blades. They are highly polished and their blue color is a light reflection.
Clik here to view.

The inside of the compressor with stationary compressor vanes.
Clik here to view.

A gas turbine casing.
Image may be NSFW.
Clik here to view.
Clik here to view.

These “dovetail joints” hold blades in place.
Clik here to view.

A gas turbine stator.
Clik here to view.

Compressor blades.
Clik here to view.

A detail of cooling holes in turbine blades.
Clik here to view.

These fuel lines feed one of the test turbine combustors at the testing facility.
Clik here to view.

A torque converter at the testing facility.
Image may be NSFW.
Clik here to view.
Clik here to view.

Exhaust vents at the testing facility. The holes are the size of wine barrels and they must withstand multiples of hurricane-force winds.
Image may be NSFW.
Clik here to view.
Image may be NSFW.
Clik here to view.
Clik here to view.

GE’s latest 9HA air cooled turbine is powering through testing. Engineers and using thousands of sensors to gather data and feet to industrial software for analysis.